Hsinchu City has replaced 600 LED street lights and is expected to be completed by the end of the year.


Recently, Hsinchu City has replaced the LEDs of two bypass lights in urban roads, and hopes to save energy and reduce carbon. Bamboo City is the key area of ​​Taiwan's science and technology industry. It is proud of the global, LED and medium- and downstream structures.

Following the full replacement of LED lights by road traffic lights, the two bypass lights in Hsinchu City Road have also been gradually replaced with LEDs. Mayor Lin Zheng attaches importance to the role of the world citizen task of protecting the earth, saving energy and reducing carbon, especially in the technology industry. The structure of the upper, middle and lower LEDs is proud of the world. It should show the advantages of the technology city at the first pace. The first phase of the Municipal Public Works Department will provide 5 yuan for the Ministry of Economic Affairs and 14 LED lamps. The modification work is scheduled to be completed by the end of December.


Figure: The 600-street lights in the urban area will be replaced by LED lights scheduled to be completed by the end of December.

The operation of the city's traffic sign lights to refit LED lights for more than four or five years, including traffic lights, red light countdown, pedestrian green road small green people, etc., according to the city's traffic department estimates, energy savings up to 2 / 3, and by material Life characteristics, lengthy maintenance intervals, and relative capital savings, the City Department of Public Works maintenance department for the road lights modified LED lights started this year, planning 14 about 600 LED street lights. The maintenance chief, Zeng Jiawen, said that at present, Zhonghua Road and Nanda Road have been completed, Minghu Road is about to end, and the remaining eleven are being processed one after another. The contractor will produce metal-plated adapters with bearing capacity according to the field light pole style. The city government has to adjust the quantity and location according to the actual situation.

Quick Turn PCB 
Some customers asked us how quickly we can do for PCB and PCB Assembly.Here,you will get the right answer.
You can get 1-2 layer PCBs  in 48 hours, and 4-6 layer  2-3 working days,8 layer 3-4 working days. All quick turn boards are also with top quality . We even did 16 layer PCB within 12 days. 

Submit your PCB specifications by emailing us your Gerber Files or by filling out the online PCB Quote form. There, you will attach your gerber files or design files and send via form to us .we are confident that we will be able to help you with your project.


You can find our standard lead time and quick turn lead time as below. Once you try us,you will know how quickly we offer. 
Quick Turn

Quick Turn PCB

Quick Turn PCB,4 Layer Purple PCB,Purple PCB,Keyboard PCB Assembly

Storm Circuit Technology Ltd , http://www.stormpcb.com