Announcement of Tender for Auxiliary Greening Project on Khalil Street (Wanxi Road-Datong Road)

Announcement of Tender for Auxiliary Greening Project on Khalil Street (Wanxi Road-Datong Road)

Announcement time: 2016-9-26



The construction project of this tender project, Kale Street (Xianxi Road-Datong Road), has been approved by the Taiyuan Development and Reform Commission with the document of “Reconstructing and Revising [2016] 188”. The tenderer is the Taiyuan Garden Construction and Development Center. Financial allocations. The project has been reported for construction and has the conditions for tendering. The project is now undergoing public tendering for the supporting greening construction.

II. Project Overview and the scope of tender

2.1 Project Overview: This project is located at Khalil Street in Taiyuan City. The construction content is as follows: The pedestrian walkway trees of the company are 669 national monuments. The total afforestation area of ​​the non-divided lanes and the central sub-lanes is 7926m2. The investment amount is about 6 million yuan.

2.2 The scope of the tender: all the contents of the scope of the construction drawings.

Third, bidder qualification requirements

3.1 The tender requires bidders to have qualifications and valid business licenses for urban landscape greening (above grade) and above, and have corresponding construction capabilities in terms of personnel, equipment, funds, etc., among which bidders propose project managers Must have a professional secondary or above grade (including intermediate grade) in gardening or a registered professional architect in municipality. He did not serve as a project manager for other construction projects.

Those who wish to participate in bidders are required to be on September 26, 2016 to September 30, 2016 (excluding legal holidays, statutory holidays, etc.)
Contact: Qian Yong

Mobile: 1314 1221 596

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.